Patrium Underground: Difference between revisions

From Elysia MC
Content added Content deleted
m (e)
Tags: Mobile edit Mobile web edit Visual edit
m (Edited stock class)
 
Line 12: Line 12:
The PU does not follow the PGR standard SRSC system for rolling stock, as it is not designed with multiple units in mind, and it was thought best to avoid mixing underground trains with mainline trains in the class system.
The PU does not follow the PGR standard SRSC system for rolling stock, as it is not designed with multiple units in mind, and it was thought best to avoid mixing underground trains with mainline trains in the class system.


=== 64 Stock ===
=== 46 Stock ===
The standard PU train type is the 64 Stock, so named because it was designed in June ('''6''') of 202'''4'''. It is a DMU made of 4-Car Units, in the format Motor-Trailer-Trailer-Motor.
The standard PU train type is the 46 Stock, so named because it was designed in June ('''6''') of 202'''4'''. It is a DMU made of 4-Car Units, in the format Motor-Trailer-Trailer-Motor.


=== Departmental Trains ===
=== Departmental Trains ===
The PU has a single Bo'Bo' Diesel locomotive, made using the front ends of two 64 Stock motor cars, with more powerful engines. It is used for construction trains, carrying stone away from the digging face and materials for station and track construction
The PU has a single Bo'Bo' Diesel locomotive, made using the front ends of two 46 Stock motor cars, with more powerful engines. It is used for construction trains, carrying stone away from the digging face and materials for station and track construction


== History ==
== History ==

Latest revision as of 21:47, 21 June 2024

The Patrium Underground (PU) is a subsidiary of the Patrium Government Railways and provides a metro service around Patrium City. It currently is under construction, with construction of infrastructure expected to be completed in Mid Summer 2024. Initial opening depends on server performance with the automation script, and will only run one or two trains until a primitive signaling system is developed.

Route[edit | hide all | hide | edit source]

The PU has one line, stopping at 4 stations.

  • Patrium Museum
  • City Centre
  • Central Station
  • Hillside

Rolling Stock[edit | hide | edit source]

The PU does not follow the PGR standard SRSC system for rolling stock, as it is not designed with multiple units in mind, and it was thought best to avoid mixing underground trains with mainline trains in the class system.

46 Stock[edit | hide | edit source]

The standard PU train type is the 46 Stock, so named because it was designed in June (6) of 2024. It is a DMU made of 4-Car Units, in the format Motor-Trailer-Trailer-Motor.

Departmental Trains[edit | hide | edit source]

The PU has a single Bo'Bo' Diesel locomotive, made using the front ends of two 46 Stock motor cars, with more powerful engines. It is used for construction trains, carrying stone away from the digging face and materials for station and track construction

History[edit | hide | edit source]

Initial Plans[edit | hide | edit source]

An urban transit network was planned ever since Patrium City was founded. It was originally planned to be an elevated minecraft gauge line, using MS5 Class Steam Locomotives, similar to the real life DLR. However, the planned one-way loop would have been limiting, and the elevated tracks above the roads made the streets below feel claustrophobic. As such the plan was changed so they would run as trams. This created new problems though, as it was feared that the trams could harm the Tektopia villagers. Eventually the solution that was decided upon was an underground metro system, based off the London Underground.

Development of the Metro[edit | hide | edit source]

The line was originally meant to be minecraft gauge, running in a loop. However, this added multiple unnecessary stations, and the line was shortened to 4 stations long. The planned gauge was altered to cape gauge. On 07/06/24, the metro trains were modelled.

Construction[edit | hide | edit source]

Construction began at the same time as the modelling of the trains, beginning with City Centre station. A lack of marble stalled construction, and a new batch of biodiesel was imported from Seananville to finish the station. Twin tunnels were dug south from City Central to Patrium Museum, in which a trench was dug and the station constructed out of diorite.

Construction was paused on 20/06/24 to wait for a construction locomotive, and for the site for Central Station to be finalised.